Sunday, December 20, 2009
CNC design
Saturday, December 19, 2009
Monday, December 14, 2009
Sunday, December 13, 2009
Friday, December 11, 2009
Wednesday, December 9, 2009
fab methods- working out some details
option 1: the wrapping clip- relates to the connection back to the framing
I think I prefer this one
option 2: the spring connection- a little more subtle? occurs between the two layers of fiberglass mesh
changes: a more delicate connection back to the main framing wrapping the steel structure. An additional layer of fiberglass mesh to hide the cables. The cables will make a truss when combined with the wood vertical member- allowing for the light connection back to the main structure (the main forces now being shear only....in theory). The glass will be attached to the back of the wood members in a shingled fashion. We still want to play with the glass finishes to see where we can go with that........clock is ticking.
model: steel backup structure (green in the model), aluminum clips (cnc'd from stock), painted fiberglass mesh for vertical shading devices, wood for vertical supports, .125" plexi for glazing
Saturday, December 5, 2009
Friday, December 4, 2009
Thursday, December 3, 2009
art of detailing
my latest revision for the art of detailing project - I plan on making this out of wood and aluminum. I would like to use a mahogany but cedar is my fall back. The aluminum will be milled, sand blasted, then polished- I really liked this finish on the some test pieces I did. Going to start buying materials today! Can't wait!
Wednesday, December 2, 2009
spaceframe - full parametric adjustability
Subscribe to:
Posts (Atom)